the hotel bedroom interior design
The Tehran Business Hotel Competition which was held in the spring of 2010 is a private competition. Bonsar Architecture Studio based in Iran was the winner of the competitors with their great proposal. The Tehran Business Hotel Competition was held because the competitor wanted in order to achieve a better one. And as a result, the competition must improve the previous design to get the building permit from the municipality rather than before. Find the weaknesses and the constrain of the primary design based on the competition brief and make it as a first step to the design process.
The three main challengers were founded by the Bonsar Architecture Studio team. The step which the Bonsar Architecture studio team is analyzed the challenges itself and then the tools their used to break the problem. It would be the main approaches defining the design process
The first that the bonsar architecture studio faced work along at the first glance over the program brief was that build the two building project in a one building project. The first building would be a comfortable hotel and the second one was a more public programs like conference center and trade center or commerce. The commerce is the most important project because its point of view for the guest or customer. Look at the relief which was semi buried under the ground was the most problem, because it will be less important place in the first sight. That was the other problem or challenge to be done for Bonsar Architecture Studio team.
The third challenge came from the program itself. Because it was the hotel project was not suitable for became an business center. The expectation of its must be revised to attract the guest or customer. So the Bonsar Architecture Studio step was to add some new programs like working area, private meeting room and traditional restaurant. Those new revised is depended for the guest activities during their stay at the comfortable hotel.
But actually besides the three problem that the team faced, there was another problem from the project itself, the location which blocked in the west site,while the other site is free. It caused the west elevation would be ignored by the customers.
Regarding the difference in height which the project has with its surrounding, which is emphasized as a result of being located on a hill, it would be visible from several parts of the city. furthermore, the client has mentioned that they wanted the building to be a land mark, which wouldn’t be possible without paying special attention to the huge wall on the west in the primary design. consequently the west elevation became an important problem to be done.
Info
- Architects: Bonsar Architecture Studio
- Location: Gandhi St.,Tehran, Iran
- Client: Moshar, Biria and Partners
- Project architect: Mohammad Majidi
- Design Collaborators: Azar Farshidi, Mehran Haghbin, Hoda Sharifian,
- Hossein Salavaty Khoshghalb, Anahita Tabrizi, Nima Dehghani,Mehdi Kamboozia, Zahra Khaniki, Bahar Ehsan, Shahram Khosravi
- Structural Engineering: Farid Farzadnia
- Mechanical consultant: Ahmadreza Ghavami
- Project Area: 12687 m²
- Plot Area: 1000 m²
- Project Year: June 2010
[via]
the hotel building and its pheriphery design
the hotel building particles architecture design
The hotel elevation analysis architecture design
the hotel elevation architecture design
The hotel landscape architecture design viewed from Gandhi Street
The hotel landscape architecture design viewed from north
The hotel landscape architecture design viewed from south
The hotel landscape architecture design viewed from the courtyard
The hotel landscape architecture design viewed from west
the hotel living room interior design
the hotel program analysis concept
the hotel public plans architecture design
The hotel room interior design
the hotel room plans interior design









